{"id":668,"date":"2023-04-24T11:31:05","date_gmt":"2023-04-24T11:31:05","guid":{"rendered":"https:\/\/titanapps.io\/blog?p=668"},"modified":"2025-05-08T10:51:09","modified_gmt":"2025-05-08T10:51:09","slug":"jira-sprints","status":"publish","type":"post","link":"https:\/\/titanapps.io\/blog\/jira-sprints","title":{"rendered":"Create and Manage Jira Sprints Like a Pro"},"content":{"rendered":"\n<p>Jira is one of the most flexible and customizable Project Management tools on the market. It\u2019s also built from the ground up with Agile in mind making it one of the best solutions for managing Sprints in Scrum.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is Scrum and how does it fit into Atlassian Jira?<\/h2>\n\n\n\n<p>Scrum is a lightweight Project management framework. It is designed to break down a large body of work into iterative increments.<\/p>\n\n\n\n<p>Scrum was originally introduced as a way of improving collaboration in teams that are working on solving complex problems. In essence, the Scrum team breaks down the entire project into Sprints \u2013 short, time-boxed periods during which a Scrum team is to deliver an agreed-upon number of increments, AKA functional features. All five of the scrum events, such as sprint planning, daily scrum, sprint review, and retrospective take place during the sprint.<\/p>\n\n\n\n<p>The Scrum framework is incomplete by design. It encourages the process of continuous learning and improving through your work. Your decisions will be based on observation, ability to adapt, and a fair bit of common sense.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"498\" height=\"331\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/image.gif\" alt=\"\" class=\"wp-image-682\"\/><\/figure><\/div>\n\n\n<p>You can learn more about Scrum from the <a href=\"https:\/\/scrumguides.org\/scrum-guide.html\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum guide<\/a> and on <a href=\"http:\/\/scrum.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">Scrum.org<\/a>. For now, I\u2019ll just assume you know the basics and focus on the elements that are directly applicable in your Jira instance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The Scrum team<\/h3>\n\n\n\n<p>The average Scrum team has three roles: Product owner, Scrum master, and Developers. <\/p>\n\n\n\n<p><strong>The Product Owner<\/strong> is accountable for the product value a Scrum team delivers. This person shares the goals of the Sprint, and should answer any questions the dev team might have regarding the product or users. PO is also responsible for <a href=\"https:\/\/titanapps.io\/blog\/jira-themes-initiatives\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jira Themes &amp; initiatives<\/a>, <a href=\"https:\/\/titanapps.io\/blog\/how-to-use-epics-in-jira\/\" target=\"_blank\" rel=\"noreferrer noopener\">Epics<\/a> and <a href=\"https:\/\/titanapps.io\/blog\/how-to-write-user-stories-in-jira\/\" target=\"_blank\" rel=\"noreferrer noopener\">User Stories<\/a>. In terms of Jira, the Product Owner is responsible for translating the <a href=\"https:\/\/titanapps.io\/blog\/project-planning-jira\/\" target=\"_blank\" rel=\"noreferrer noopener\">project plan into Jira<\/a>, <a href=\"https:\/\/titanapps.io\/blog\/product-roadmap-in-jira\/\">Jira roadmap<\/a> design, as well as backlog management and prioritization.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"481\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-1024x481.png\" alt=\"\" class=\"wp-image-2504\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-1024x481.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-300x141.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-768x361.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-1536x722.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-2048x963.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-24x11.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-36x17.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-in-jira-48x23.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>The Scrum Master<\/strong> acts as the team\u2019s coach. This person observes everyone\u2019s activities and helps deliver a successful result. Scrum Master facilitates standups, helps to keep the scope in check during sprint planning, and hosts retrospectives. In terms of Jira, the Scrum Master is responsible for the Sprint board. He is usually the admin on the project and helps ensure that the cards are updated and flow through the established Jira <a href=\"https:\/\/titanapps.io\/blog\/jira-workflow\/\" target=\"_blank\" rel=\"noreferrer noopener\">workflow<\/a>.&nbsp;<\/p>\n\n\n\n<p><strong>Developers<\/strong> deliver the work during the active Sprint. They have to determine what they can deliver during a Sprint. To them, Jira is a board with tasks they can contribute to.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Product backlog<\/h3>\n\n\n\n<p>Typically, the Product Owner creates the first batch of User Stories that are added to a backlog. These stories will be generalized as their main goal is to introduce a certain vector to the development process. Think of it as a place to store concepts and ideas. They may (or may not) become TODOs that will shape the product.&nbsp;<\/p>\n\n\n\n<p>You can access your backlog in Jira from the backlog tab in the sidebar. You\u2019ll then have to scroll down past planned sprints.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"570\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-1024x570.png\" alt=\"\" class=\"wp-image-2507\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-1024x570.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-300x167.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-768x428.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-1536x855.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-2048x1140.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-24x13.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-36x20.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/product-backlog-48x27.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Sprint backlog<\/h3>\n\n\n\n<p>According to <a href=\"https:\/\/titanapps.io\/blog\/jira-best-practices\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jira best practices<\/a>, after the initial user stories are refined, the team can agree to add them to the Sprint backlog. This is a separate pool of tickets that you\u2019ll be working on during one Sprint. You\u2019ll only want to add those stories that are immediately actionable. <\/p>\n\n\n\n<p>You don\u2019t have to cover 100% of the acceptance criteria at this stage, but make sure that the team understands the story well enough to be confident in their ability to deliver the result. Many companies use the <a href=\"https:\/\/www.agilealliance.org\/glossary\/invest\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">INVEST<\/a> method to set this Definition of ready in stone. You\u2019ll want to move your work items from the backlog to the Sprint backlog in Jira after the Sprint planning session.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"629\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-1024x629.png\" alt=\"\" class=\"wp-image-2506\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-1024x629.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-300x184.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-768x472.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-1536x944.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-2048x1259.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-24x15.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-36x22.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Template-main-71-48x30.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Story points<\/h3>\n\n\n\n<p>Jira work items have a custom field for Story Points. Engineers use them to measure the complexity of a story. The discussion regarding how many story points a story is worth happens during the Sprint Planning meeting, and the complexity is based on effort, uncertainty (engineers not being sure how they can deliver a feature), and risk.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"571\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-1024x571.png\" alt=\"\" class=\"wp-image-2508\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-1024x571.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-300x167.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-768x429.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-1536x857.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-2048x1143.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-24x13.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-36x20.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/story-points-48x27.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The team will be burning these story points by completing the work items (issues). How does this work?<\/p>\n\n\n\n<ul class=\"wp-block-list large-list\">\n<li>The team discusses the work they need to do before the Sprint begins. All of the stories are reviewed and assigned with story points based on their complexity.<\/li>\n\n\n\n<li>When the team commits to a Sprint, we know the stories we will be working on as well as their \u201cworth\u201d in points.<\/li>\n\n\n\n<li>The team burns down stories that have met the Definition of Done by the end of the Sprint.&nbsp;<\/li>\n\n\n\n<li>Any stories that have not been completed are moved back to the backlog and then refined and potentially re-estimated. These stories can then be moved back to the Sprint if the team decides on doing so.<\/li>\n\n\n\n<li>When this practice is consistent for each sprint \u2013 the team will learn their velocity (the number of story points they typically burn during a Sprint) over time.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How long should a Sprint take?<\/h2>\n\n\n\n<p>A Sprint is always fixed in time. Teams do this to create consistency and accurately estimate the scope they can deliver throughout one Sprint. The nature of Scrum encourages teams to decide the perfect length of a Sprint that works for them based on Empiric evidence. The main point is in understanding why you need a time-boxed Sprint.<\/p>\n\n\n\n<ul class=\"wp-block-list large-list\">\n<li>Force prioritization. You start thinking about what is the most important feature you want to deliver when you have a defined time frame to complete a body of work.<\/li>\n\n\n\n<li>Demonstrate progress. The timeboxed iterations give an opportunity to regularly demonstrate progress on completed work. This gives a clear understanding of what\u2019s going on in the project to the business side, and it also boosts team morale.&nbsp;<\/li>\n\n\n\n<li>Avoid perfectionism and motivate closure. When you have an established deadline for the sprint, you plan things accordingly. You won\u2019t have the time to try to make things perfect.<\/li>\n\n\n\n<li>Improve planning. It\u2019s easier to plan things for an established duration, especially if you have a couple of completed Sprints under your belt and know the scope the team can handle.<\/li>\n\n\n\n<li>Continuous feedback. You have an opportunity to constantly give and receive feedback in an iterative and time-boxed Sprint.<\/li>\n<\/ul>\n\n\n\n<p>You can decide on the optimal length of a Sprint. Base this decision on the specifics of product\/project, team maturity, team size and the factors mentioned above. I would say that the optimal sprint length is when you can deliver a feature within your defined timebox. In this way, all the factors above start working for your team, and you are making the most value of your sprints.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Sprint planning<\/h2>\n\n\n\n<p>We\u2019ve touched on the subject of Sprint Planning before. Let\u2019s look at it in more detail. The Sprint capacity planning session is the meeting when you decide which tickets should make their journey from the product backlog and into the Sprint backlog. Every Sprint planning session is unique, but all must focus on answering three primary questions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Why is THIS Sprint valuable?<\/li>\n\n\n\n<li>What can we deliver during this Sprint?<\/li>\n\n\n\n<li>How will we deliver the work we\u2019ve planned?&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>Answering these questions will help you refine your stories. You\u2019ll know their priorities and have an approximation of how much work each of them will require.&nbsp;The trick to Running a Sprint Planning session successfully is making sure that the whole team is prepared.&nbsp; The Product Owner needs to have a clear understanding of the Sprint\u2019s goals. They should select the stories for the Sprint Planning session with this concept in mind. The Scrum Master can help by asking probing questions and making sure the scope doesn\u2019t end up overblown. And the developers can use their analytical skills to try to understand stories, potential solutions, and the complexity of implementation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to create Sprints in Jira<\/h2>\n\n\n\n<p>Let\u2019s face it, Jira has many work items (issues) with its UI. Sometimes finding the right button to enable or start something can be nothing short of a herculean feat. Case in point: finding closed Sprints is a hustle.\u00a0<\/p>\n\n\n\n<p>Luckily, starting a new Sprint is as simple as ABC. Navigate to the backlog from the sidebar and click the bright blue \u201cStart Sprint\u201d button once the work items from your Project backlog are refined, prioritized, and moved to the Sprint backlog.\u00a0<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"329\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-1024x329.png\" alt=\"\" class=\"wp-image-2510\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-1024x329.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-300x96.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-768x247.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-1536x493.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-2048x657.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-24x8.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-36x12.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-in-jira-48x15.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Clicking on the \u201cStart Sprint\u201d button will open a pop-up window where you\u2019ll fill in the details of your Sprint, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sprint name<\/li>\n\n\n\n<li>Duration: You can select a desired duration from the drop-down menu<\/li>\n\n\n\n<li>Start date \/ end date<\/li>\n\n\n\n<li>And the goal of the Sprint.<\/li>\n<\/ul>\n\n\n\n<p>Note that fields that are marked with a red asterisk are mandatory.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"905\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-1024x905.png\" alt=\"\" class=\"wp-image-2512\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-1024x905.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-300x265.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-768x679.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-1536x1358.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-2048x1811.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-24x21.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-36x32.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-sprint-48x42.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Parallel Sprints in Jira<\/h2>\n\n\n\n<p>Parallel Sprints can be a useful tool when you\u2019d like to run several Sprints from the same backlog. This functionality can come in handy when you want to separate your teams, like developers and designers, while still working on the same goal.<\/p>\n\n\n\n<p>Running parallel Sprints is slightly easier in team-managed projects. You can create as many of them as you need from the backlog.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"610\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-1024x610.png\" alt=\"\" class=\"wp-image-2513\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-1024x610.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-300x179.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-768x458.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-1536x915.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-2048x1220.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-24x14.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-36x21.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/start-parallel-sprints-in-jira-48x29.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Once you\u2019ve created your parallel sprint \u2013 click on the \u201cStart Sprint\u201d button. This will create a new active Sprint in Jira simultaneously.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"513\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-1024x513.png\" alt=\"\" class=\"wp-image-2514\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-1024x513.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-300x150.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-768x385.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-1536x769.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-2048x1025.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-24x12.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-36x18.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/sprint-backlog-for-parallel-48x24.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>You can then select the Sprint you want to see on the board from the drop-down sprint selector.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"821\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-1024x821.png\" alt=\"\" class=\"wp-image-2515\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-1024x821.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-300x241.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-768x616.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-1536x1232.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-2048x1643.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-24x19.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-36x29.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/a-parallel-sprint-selector-48x39.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Setting up parallel sprints in a company-managed project is a bit trickier. You\u2019ll need a user with global Jira Admin permissions. This user can do the following if you are running your instance on Jira Data Center:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Select <strong>Administration<\/strong> (??) &gt; <strong>Applications<\/strong>, then scroll down the page to the <strong>Jira Software <\/strong>section.<\/li>\n\n\n\n<li>Under <strong>Jira Software configuration<\/strong>, select the <strong>Parallel Sprints<\/strong> checkbox.<\/li>\n<\/ol>\n\n\n\n<p>And the following steps apply for Jira Cloud:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>From the global navigation, select <strong>Settings<\/strong> () &gt; <strong>Products<\/strong>.<\/li>\n\n\n\n<li>Under Jira Software configuration, select the toggle for <strong>Parallel sprints<\/strong>.<\/li>\n<\/ol>\n\n\n\n<p><strong>Note<\/strong>: The velocity chart will not show the velocity per team.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to list all Sprints?<\/h2>\n\n\n\n<p>I\u2019ve seen people trying all kinds of crazy things with \u201cSprint JQL\u201d. Sometimes it works for them, sometimes it doesn\u2019t. In my experience, JQL is best used for work items only.\u00a0<\/p>\n\n\n\n<p>However, you can use the following string to list all Sprints and the work items within them based on the Sprint field. This can be handy when you are looking to review previously closed Sprints.<\/p>\n\n\n\n<div class=\"copy-template \">\n    <div class=\"copy-template__lines\">\n    <div class=\"copy-template__top\"><\/div>\n    <div class=\"copy-template__markdown\">\n      <p>Sprint in (closedSprints(),openSprints()) AND project = &#8220;XYZ&#8221;\u00a0<\/p>\n    <\/div>\n    <div class=\"copy-template__bottom\"><\/div>\n  <\/div>\n  <button class=\"copy-template__copy btn btn-primary\">\n    <i class=\"icon-copy\"><\/i>\n    Copy    <span class=\"copy-template__copied\">Copied<\/span>\n  <\/button>\n<\/div>\n\n\n\n<p>Yet, there\u2019s a much simpler way of listing and reviewing your sprints \u2013 the <a href=\"https:\/\/support.atlassian.com\/jira-software-cloud\/docs\/view-and-understand-the-sprint-report\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Sprint report<\/a>. The limitation to this convenience comes from the fact that the report is limited to company-managed projects and it is also board-specific. <\/p>\n\n\n\n<p>That being said, it will show you the list of your Sprints along with associated work items.\u00a0That being said, you can use the Sprint Burnup Chart in team-managed projects to achieve the same goal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to end a Sprint in Jira?<\/h2>\n\n\n\n<p>Technically, ending a Sprint is a matter of 2 clicks. Go to your backlog tab and click on the \u201cComplete Sprint\u201d button.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"357\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-1024x357.png\" alt=\"\" class=\"wp-image-2516\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-1024x357.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-300x105.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-768x268.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-1536x536.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-2048x715.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-24x8.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-36x13.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/complete-sprint-button-48x17.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Clicking this button kicks off a different Sprint event \u2013 the Sprint Retrospective. This is a meeting where the whole Scrum team inspects how the Sprint went. Use this time to talk about individual performance, interactions, and processes. Try to find ways where you can improve or optimize something or maybe even adjust your Definition of Done.<\/p>\n\n\n\n<p>We typically follow a format where each team member lists the \u201cgood\u2019s\u201d and the \u201cimproves\u201d. This format of feedback works wonders as it gives everyone a chance to cherish a job well done while offering an opportunity to voice their opinion on things that might have been smoother.<\/p>\n\n\n\n<p>Your incomplete work items will be moved into the backlog once you complete a Sprint.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to measure relevant Sprint metrics in Jira?<\/h2>\n\n\n\n<p>While we are on the subject of reports, Jira offers a handy selection to help you analyze your team\u2019s performance to adjust scope or make more accurate plans and estimates for the future Sprint.&nbsp;When talking about Sprints,&nbsp; there are three major reports you should focus on:<\/p>\n\n\n\n<ul class=\"wp-block-list large-list\">\n<li>Burndown chart: Check on your team\u2019s progress by comparing the numbers of Story Points that are left versus an approximation of an ideal burndown rate.&nbsp;<\/li>\n\n\n\n<li>Burnup report: This report is the opposite of the burndown chart. It compares completed work (the number of burned Story Points) versus an ideal burndown rate and the scope.<\/li>\n\n\n\n<li>Velocity chart: You can use this chart to plan your future sprints based on the amount of work that is typically done during a sprint.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Apps that help run Sprints<\/h2>\n\n\n\n<p><strong><a href=\"https:\/\/marketplace.atlassian.com\/apps\/1216451\/smart-checklist-for-jira-pro?hosting=cloud&amp;tab=overview\">Smart Checklist<\/a>:<\/strong> A <a href=\"https:\/\/jirachecklist.com\/\" target=\"_blank\" rel=\"noreferrer noopener\">Jira Checklist<\/a> allows you to build actionable checklists and checklist templates. You can use them to enforce accountability and standardization. The app shines when the development team needs to design and refine your stories allowing you to add clear and visible <a href=\"https:\/\/titanapps.io\/blog\/definition-of-done-in-jira\/\" target=\"_blank\" rel=\"noreferrer noopener\">Definition of Done<\/a> and <a href=\"https:\/\/titanapps.io\/blog\/acceptance-criteria-jira\/\" target=\"_blank\" rel=\"noreferrer noopener\">Acceptance Criteria<\/a> checklists to your work items.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Smart Checklist for Jira | Getting Started\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/mOuUImPHobg?start=2&#038;feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p><strong><a href=\"https:\/\/planningpokeronline.com\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Planning Poker<\/a><\/strong><a href=\"https:\/\/planningpokeronline.com\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong> Online<\/strong><\/a>: This tool helps the team assign story points to their work items. The trick is that each member of the team assigns a certain value to a work item incognito. Then, when the cards are revealed, you\u2019ll see whether the team has achieved a consensus regarding the complexity of the task. If you have different opinions \u2013 great. There\u2019s room for discussion. The app has a Jira integration which makes it easy to include it into your process.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"715\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-1024x715.png\" alt=\"\" class=\"wp-image-2517\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-1024x715.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-300x210.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-768x537.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-1536x1073.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-2048x1431.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-24x17.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-36x25.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/planning-poker-for-sprint-planning-48x34.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><a href=\"https:\/\/easyretro.io\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\"><strong>Easy Retro<\/strong><\/a>: This App helps run Sprint retrospectives. It offers a board that\u2019s similar to the one you are used to seeing in Jira. The difference is that the lanes are dedicated to things that went well, things that require improvements, and to actionable items or the things you can improve in the next sprint. Easy retro also offers surveys that help with gathering feedback.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"592\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-1024x592.png\" alt=\"\" class=\"wp-image-2518\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-1024x592.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-300x173.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-768x444.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-1536x888.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-2048x1184.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-24x14.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-36x21.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/easy-retro-app-for-sprint-retrospectives-48x28.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<section class=\"banner-block\">\n  <div class=\"banner-block__info\">\n    <h5 class=\"banner-block__title\">Add checklists to your Jira tasks<\/h5>\n        <a href=\"https:\/\/marketplace.atlassian.com\/apps\/1216451\/smart-checklist-for-jira-pro?hosting=cloud&#038;tab=overview\" target=\"_blank\" class=\"banner-block__link btn btn-orange\" >Try it free<\/a>\n  <\/div>\n  <div class=\"banner-block__image\">\n    <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2020\/05\/Smart-Checklist_Jira-3.svg\" alt=\"\" width=\"420\" height=\"331\">\n  <\/div>\n<\/section>\n\n\n\n<section class=\"writer\">\n  <div class=\"writer__image\">\n    <img alt='Oleksandr Siryi' src='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-180x180.png' srcset='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-361x360.png 2x' class='avatar avatar-180 photo' height='180' width='180' \/>  <\/div>\n\n  <div class=\"writer-data\">\n    <span class=\"writer-data__label\">Article by<\/span>\n    <span class=\"writer-data__name\">\n      Oleksandr Siryi    <\/span>\n    <div class=\"writer-data__bio\">\n          <\/div>\n\n      <\/div>\n<\/section>\n\n\n\n<section class=\"writer\">\n  <div class=\"writer__image\">\n    <img alt='Oleksandr Siryi' src='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-180x180.png' srcset='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-361x360.png 2x' class='avatar avatar-180 photo' height='180' width='180' \/>  <\/div>\n\n  <div class=\"writer-data\">\n    <span class=\"writer-data__label\">Article by<\/span>\n    <span class=\"writer-data__name\">\n      Oleksandr Siryi    <\/span>\n    <div class=\"writer-data__bio\">\n          <\/div>\n\n      <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Jira is one of the most flexible and customizable Project Management tools on the market. It\u2019s also built from the ground up with Agile in mind making it one of the best solutions for managing Sprints in Scrum. What is Scrum and how does it fit into Atlassian Jira? Scrum is a lightweight Project management [&hellip;]<\/p>\n","protected":false},"author":181780125,"featured_media":5983,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1401,1405,1419,1409],"tags":[],"coauthors":[1427],"class_list":["post-668","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article","category-atlassian-jira","category-project-management","category-smart-checklist"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Jira Sprints: How to Create and Manage | TitanApps Blog<\/title>\n<meta name=\"description\" content=\"Let&#039;s talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/titanapps.io\/blog\/jira-sprints\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jira Sprints: How to Create and Manage | Smart Checklist Blog\" \/>\n<meta property=\"og:description\" content=\"Let&#039;s talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/titanapps.io\/blog\/jira-sprints\" \/>\n<meta property=\"og:site_name\" content=\"Titanapps\" \/>\n<meta property=\"article:published_time\" content=\"2023-04-24T11:31:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-08T10:51:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/JiraSprints.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Oleksandr Siryi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Jira Sprints: How to Create and Manage | Smart Checklist Blog\" \/>\n<meta name=\"twitter:description\" content=\"Let&#039;s talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/JiraSprints.png\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Oleksandr Siryi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints\",\"url\":\"https:\/\/titanapps.io\/blog\/jira-sprints\",\"name\":\"Jira Sprints: How to Create and Manage | TitanApps Blog\",\"isPartOf\":{\"@id\":\"https:\/\/titanapps.io\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage\"},\"image\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage\"},\"thumbnailUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg\",\"datePublished\":\"2023-04-24T11:31:05+00:00\",\"dateModified\":\"2025-05-08T10:51:09+00:00\",\"author\":{\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf\"},\"description\":\"Let's talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.\",\"breadcrumb\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/titanapps.io\/blog\/jira-sprints\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage\",\"url\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg\",\"contentUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg\",\"width\":480,\"height\":320},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-sprints#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/titanapps.io\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Create and Manage Jira Sprints Like a Pro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/titanapps.io\/blog\/#website\",\"url\":\"https:\/\/titanapps.io\/blog\/\",\"name\":\"Titanapps\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/titanapps.io\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf\",\"name\":\"Oleksandr Siryi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/image\/3071edc8a225b0198b189bd93cd7db6f\",\"url\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png\",\"contentUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png\",\"caption\":\"Oleksandr Siryi\"},\"sameAs\":[\"http:\/\/blogjirachecklist.wordpress.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jira Sprints: How to Create and Manage | TitanApps Blog","description":"Let's talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/titanapps.io\/blog\/jira-sprints","og_locale":"en_US","og_type":"article","og_title":"Jira Sprints: How to Create and Manage | Smart Checklist Blog","og_description":"Let's talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.","og_url":"https:\/\/titanapps.io\/blog\/jira-sprints","og_site_name":"Titanapps","article_published_time":"2023-04-24T11:31:05+00:00","article_modified_time":"2025-05-08T10:51:09+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/JiraSprints.png","type":"image\/png"}],"author":"Oleksandr Siryi","twitter_card":"summary_large_image","twitter_title":"Jira Sprints: How to Create and Manage | Smart Checklist Blog","twitter_description":"Let's talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.","twitter_image":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/JiraSprints.png","twitter_misc":{"Written by":"Oleksandr Siryi","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/titanapps.io\/blog\/jira-sprints","url":"https:\/\/titanapps.io\/blog\/jira-sprints","name":"Jira Sprints: How to Create and Manage | TitanApps Blog","isPartOf":{"@id":"https:\/\/titanapps.io\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage"},"image":{"@id":"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage"},"thumbnailUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg","datePublished":"2023-04-24T11:31:05+00:00","dateModified":"2025-05-08T10:51:09+00:00","author":{"@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf"},"description":"Let's talk about creating, managing and running Sprints and parallel Sprints. This guide will cover both theory and practical application of Scrum in Jira.","breadcrumb":{"@id":"https:\/\/titanapps.io\/blog\/jira-sprints#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/titanapps.io\/blog\/jira-sprints"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/titanapps.io\/blog\/jira-sprints#primaryimage","url":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg","contentUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/04\/Subtasks-Not-Showing-On-Jira-Board-FEFAE9-1.svg","width":480,"height":320},{"@type":"BreadcrumbList","@id":"https:\/\/titanapps.io\/blog\/jira-sprints#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/titanapps.io\/blog\/"},{"@type":"ListItem","position":2,"name":"Create and Manage Jira Sprints Like a Pro"}]},{"@type":"WebSite","@id":"https:\/\/titanapps.io\/blog\/#website","url":"https:\/\/titanapps.io\/blog\/","name":"Titanapps","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/titanapps.io\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf","name":"Oleksandr Siryi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/image\/3071edc8a225b0198b189bd93cd7db6f","url":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png","contentUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png","caption":"Oleksandr Siryi"},"sameAs":["http:\/\/blogjirachecklist.wordpress.com"]}]}},"article_bg":"#EDF4FD","_links":{"self":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/668"}],"collection":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/users\/181780125"}],"replies":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/comments?post=668"}],"version-history":[{"count":23,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/668\/revisions"}],"predecessor-version":[{"id":5984,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/668\/revisions\/5984"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/media\/5983"}],"wp:attachment":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/media?parent=668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/categories?post=668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/tags?post=668"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/coauthors?post=668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}