{"id":1305,"date":"2024-02-20T09:33:57","date_gmt":"2024-02-20T09:33:57","guid":{"rendered":"https:\/\/titanapps.io\/blog?p=1305"},"modified":"2025-08-15T08:35:00","modified_gmt":"2025-08-15T08:35:00","slug":"jira-product-managers","status":"publish","type":"post","link":"https:\/\/titanapps.io\/blog\/jira-product-managers","title":{"rendered":"Jira For Product Managers: Useful Features Explained"},"content":{"rendered":"\n<p>Marty Cagan <a href=\"https:\/\/www.amazon.com\/INSPIRED-Create-Tech-Products-Customers\/dp\/1119387507\">describes the job of the Product Manager<\/a> as \u201c<em>to discover a product that is valuable, usable, and feasible<\/em>\u201d. Finding the balance between the business, users, and technology demands a diverse skill set. There are many things that are going on simultaneously that require attention.&nbsp;&nbsp;<\/p>\n\n\n\n<p>In this regard, Jira is great. Sure, it has some downsides, but the tool can help Product Managers to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Keep the product strategy aligned<\/li>\n\n\n\n<li>Clearly prioritize tasks while keeping them structured and organized<\/li>\n\n\n\n<li>Analyze the performance of your team<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Use a roadmap to keep your strategy aligned&nbsp;<\/h2>\n\n\n\n<p>As powerful as Jira is in the right hands, it is not a solution for everything. For instance, it is probably not the best tool for developing a<a href=\"https:\/\/railsware.com\/blog\/product-roadmap\/\"> product roadmap<\/a>. However, it is quite good for managing one.&nbsp;<\/p>\n\n\n\n<p>What this means is that Jira has great functionality for managing roadmaps in a quick, actionable, and transparent way. Nevertheless, it requires proper input: You need to break down your scope into <a href=\"https:\/\/titanapps.io\/blog\/how-to-use-epics-in-jira\/\">Epics<\/a> and tasks before you start building a roadmap in Jira.&nbsp;<\/p>\n\n\n\n<p>We typically use a framework called <a href=\"https:\/\/railsware.com\/bridges-framework\/\">BRIDGeS<\/a> for multi-context analysis of a project. This framework leaves us with prioritized, ready-to-use Epics and tasks at the end of the session.&nbsp;<\/p>\n\n\n\n<p>Given this article is not about <a href=\"https:\/\/titanapps.io\/blog\/product-roadmap-in-jira\/\">roadmaps<\/a> per se, I would rather not go into too much detail. I will be focusing on Jira instead.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Setting up a Timeline in Jira<\/h3>\n\n\n\n<p>Once you have your work broken down into Epics and tasks, creating a roadmap &#8211; or, as Jira calls it &#8211; a Timeline is quite simple.&nbsp;<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Navigate to your board;<\/li>\n\n\n\n<li>Select the \u201cTimeline\u201d option from the menu on the right;<\/li>\n\n\n\n<li>Click on the \u201c+ Create Epic\u201d to add an Epic;<\/li>\n\n\n\n<li>Add child work items (issues) by clicking on the \u201c+\u201d sign next to the Epic;<\/li>\n\n\n\n<li><em>Click on the timeline to set the timeframe for the Epic.&nbsp;<\/em><\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"415\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-1024x415.png\" alt=\"\" class=\"wp-image-2983\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-1024x415.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-300x121.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-768x311.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-1536x622.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-2048x829.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-24x10.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-36x15.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/timeline-48x19.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Tips and Tricks for using Jira\u2019s Timeline feature<\/h3>\n\n\n\n<p>Unlike most Jira features, the Timeline is rather intuitive and friendly to new users. Still, there are certain easily missable tips and tricks that can make your job much simpler. It\u2019s just that you need to know where to look ?<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Add Dependencies<\/strong>: You can add Dependencies between Epics from the Timeline. Simply hover over the timeline for an Epic and you will see two dots &#8211; one at the top right corner and one in the bottom left corner. Click and drag them to link one Epic to another. This is useful for understanding the order of work or visualizing potential blockers.<\/li>\n<\/ul>\n\n\n\n<section class=\"note\" style=\"background: #fefae9\">\n  <div class=\"note-heading\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"44\" height=\"44\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note.png\" class=\"note-heading__image\" alt=\"\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note.png 44w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note-24x24.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note-36x36.png 36w\" sizes=\"(max-width: 44px) 100vw, 44px\" \/>    <span class=\"note__label\">Note<\/span>\n  <\/div>\n      <div class=\"note__text\">\n        <p>The color of the connective thread will change to red if the dates of Epics overlap. This feature is quite handy for easily seeing if certain dependencies are becoming blockers. Still, I\u2019d recommend using dependencies wisely, otherwise the roadmap will become confusing because of the intertwined Epics.<\/p>\n    <\/div>\n  <\/section>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"482\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-1024x482.png\" alt=\"\" class=\"wp-image-2985\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-1024x482.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-300x141.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-768x362.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-1536x723.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-2048x964.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-24x11.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-36x17.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Dependencies-48x23.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Use different colors for Epics<\/strong>: You can right-click on the timeframe to easily change the color of an Epic or to remove start and end dates.&nbsp; Color-coding your Epics is a useful element of visualization.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"399\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-1024x399.png\" alt=\"\" class=\"wp-image-2986\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-1024x399.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-300x117.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-768x300.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-1536x599.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-2048x799.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-24x9.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-36x14.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/colors-for-epics-48x19.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>View settings<\/strong>: You can adjust the settings of the timeline if you wish to filter out certain completed work items (issues) or expand\/collapse all of the Epics at the same time. Another useful option you can find in the view settings is the progress bar. Enable it to see a bar indicating the progress of an Epic.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"853\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-1024x853.png\" alt=\"\" class=\"wp-image-2987\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-1024x853.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-300x250.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-768x640.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-1536x1280.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-2048x1707.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-24x20.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-36x30.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/view-settings-48x40.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Filter out Epics with a certain status<\/strong>: You can use the status category filter to hide the Epics and tasks that are marked as done from the timeline. This simple filter greatly improves the visibility of the roadmaps for times when you need to review done\/in progress\/future scope.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"793\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-1024x793.png\" alt=\"\" class=\"wp-image-2989\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-1024x793.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-300x232.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-768x595.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-1536x1189.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-2048x1585.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-24x19.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-36x28.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/projects-timeline-1-48x37.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Prioritize and manage tasks in the backlog<\/h2>\n\n\n\n<p>Now that we have an actionable plan, let\u2019s take a look at how Jira can be used to execute it.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Setting up a backlog in a Kanban project<\/h3>\n\n\n\n<p>In my experience, most Agile teams prefer to use a Scrum board that has the backlog feature enabled by default. That being said, a Kanban board needs a little bit of tweaking if you want to have a separate backlog rather than storing all of your work items on the board.\u00a0<\/p>\n\n\n\n<p>The task of adding a backlog is slightly simpler for <strong>Team-Managed projects<\/strong>. Simply select the Add View option from the left side panel and enable the backlog.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"670\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-1024x670.png\" alt=\"\" class=\"wp-image-2990\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-1024x670.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-300x196.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-768x503.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-1536x1005.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-2048x1340.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-24x16.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-36x24.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/team-managed-projects-48x31.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The process of adding the backlog in a <a href=\"https:\/\/titanapps.io\/blog\/jira-kanban-board\/\"><strong>Company-Managed project<\/strong><\/a> is a bit trickier.&nbsp;&nbsp;<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Go to the three dots menu at the top right corner of your board<\/li>\n\n\n\n<li>Select <strong>Board settings<\/strong><\/li>\n\n\n\n<li>Select the <strong>Columns <\/strong>option<\/li>\n\n\n\n<li>Drag the backlog status card from the board and into the Kanban backlog column<\/li>\n\n\n\n<li>Delete the original Backlog column by clicking on the trash bin icon<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"717\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-1024x717.png\" alt=\"\" class=\"wp-image-2991\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-1024x717.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-300x210.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-768x538.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-1536x1075.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-2048x1433.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-24x17.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-36x25.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-kanban-board-columns-48x34.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Going back to the board, you\u2019ll see that it has only three columns left, and the backlog has been moved to the side panel.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"638\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-1024x638.png\" alt=\"\" class=\"wp-image-2993\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-1024x638.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-300x187.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-768x479.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-1536x957.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-2048x1276.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-24x15.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-36x22.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/jira-board-48x30.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<section class=\"note\" style=\"background: #fefae9\">\n  <div class=\"note-heading\">\n        <span class=\"note__label\">Hint<\/span>\n  <\/div>\n      <div class=\"note__text\">\n        <p>This approach has an added benefit. Creating work items from the <a href=\"https:\/\/titanapps.io\/blog\/jira-backlog-grooming-refinement\/\">Backlog<\/a> screen is much simpler and faster than from the board. Just click on the <strong>+ Create Work Item<\/strong> button and type in the name of your task. You can keep on typing and hitting enter to add new work items. And you can change their type as well.<\/p>\n    <\/div>\n  <\/section>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"443\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-1024x443.png\" alt=\"\" class=\"wp-image-2766\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-1024x443.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-300x130.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-768x332.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-1536x664.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-2048x885.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-24x10.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-36x16.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2023\/08\/backlog-1-1-48x21.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Setting up a backlog (or several) in a Scrum project<\/h3>\n\n\n\n<p>As I mentioned earlier, the Scrum project comes with the backlog feature enabled by default. That said, there is a major difference between the backlogs in Scrum and Kanban Jira projects: <strong>A Scrum Project has two backlogs by default<\/strong>.&nbsp;<\/p>\n\n\n\n<p>One is the Project Backlog and the other is the Sprint Backlog.&nbsp;<\/p>\n\n\n\n<p><strong>The sprint backlog <\/strong>consists of a set of user stories or tasks that the development team commits to completing within a specific sprint or time-boxed iteration. It is a subset of the product backlog and represents the work <a href=\"https:\/\/titanapps.io\/blog\/jira-sprint-planning\/\">sprint planning<\/a> for that particular sprint.<\/p>\n\n\n\n<p><strong>The product backlog<\/strong> contains a prioritized list of all the desired features, enhancements, and bug fixes for the product. It represents the complete scope of work that needs to be done over multiple sprints.<\/p>\n\n\n\n<section class=\"note\" style=\"background: #fefae9\">\n  <div class=\"note-heading\">\n    <img loading=\"lazy\" decoding=\"async\" width=\"44\" height=\"44\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note.png\" class=\"note-heading__image\" alt=\"\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note.png 44w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note-24x24.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/08\/note-36x36.png 36w\" sizes=\"(max-width: 44px) 100vw, 44px\" \/>    <span class=\"note__label\">Hint<\/span>\n  <\/div>\n      <div class=\"note__text\">\n        <p>The backlog view in Jira allows you to create several Sprints. These Sprints can be used as separate backlogs for certain specific tasks. For example, you can use these Sprints as separate backlogs for Bugs, Support Requests, the Icebox, etc. This functionality is super handy for keeping your work well-organized. Plus, this approach allows you to keep your work well-organized. The tasks from these backlogs can be pulled into the Sprint Backlog during the <a href=\"https:\/\/titanapps.io\/blog\/jira-sprint-planning\/\">Sprint Planning Session<\/a>.<\/p>\n    <\/div>\n  <\/section>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"381\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-1024x381.png\" alt=\"\" class=\"wp-image-2995\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-1024x381.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-300x112.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-768x286.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-1536x572.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-2048x763.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-24x9.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-36x13.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/sprint-planning-session-48x18.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Story Points<\/h3>\n\n\n\n<p>As a feature, <a href=\"https:\/\/titanapps.io\/blog\/story-points-jira\/\">Story Points<\/a> are used to estimate the complexity of a user story.&nbsp;<\/p>\n\n\n\n<p>Typically, we use the following approach when it comes to assigning points to user stories:<\/p>\n\n\n\n<table id=\"tablepress-20\" class=\"tablepress tablepress-id-20\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Point<\/th><th class=\"column-2\">Description<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">One-liner change. You know what should be changed. Very easy to test.<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">You are aware of what to do. Changes are bigger than one-liner~1-2 days to implement. May include regression testing<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">Bigger scope. May require some research\/documentation reading\/codebase research. Includes unknown parts.<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">Biggest story. Not enough to split.<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">Must be split. Do research first.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-20 from cache -->\n\n\n\n<h3 class=\"wp-block-heading\">Bonus tip: Backlog refinement<\/h3>\n\n\n\n<p>Backlog refinement is the process of reviewing, prioritizing, and tidying up the backlog. It is a necessary activity as, over time, people will add a lot of tasks that are missing context.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"578\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-1024x578.png\" alt=\"\" class=\"wp-image-2996\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-1024x578.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-300x169.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-768x434.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-1536x867.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-2048x1156.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-24x14.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-36x20.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/refinement-48x27.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><a href=\"https:\/\/dou.ua\/forums\/topic\/45320\/\">Image Source<\/a><\/figcaption><\/figure>\n\n\n\n<p>You can learn more about <a href=\"https:\/\/titanapps.io\/blog\/jira-backlog-grooming-refinement\/\">refinement from this guide<\/a>. For now, let\u2019s focus on the benefits of tidying up your tasks:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The team is working on the tasks that are adding real value to the product<\/li>\n\n\n\n<li>The tasks are optimized and broken down in a way that a single work item doesn\u2019t take longer than an entire Sprint<\/li>\n\n\n\n<li>The work that is in progress reflects the roadmap<\/li>\n<\/ul>\n\n\n\n<p>How do we do it?<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>We typically refine the backlog once every two weeks<\/li>\n\n\n\n<li>We take the stories from the product backlog and place them into relevant Sprint containers like Bugs, Technical Debt, or upcoming Sprint&nbsp;<\/li>\n\n\n\n<li>We review the estimation and priority of the tasks that are being moved from the Product Backlog<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Analyze the performance of your team with the built-in reports<\/h2>\n\n\n\n<p>Jira has a variety of reporting tools that are available to Product Managers. They are easily accessible from the reports tab on the right-side menu. &nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"461\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-1024x461.png\" alt=\"\" class=\"wp-image-2997\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-1024x461.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-300x135.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-768x346.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-1536x692.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-2048x923.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-24x11.png 24w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-36x16.png 36w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/agile-48x22.png 48w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The Reports tab may not be enabled for you by default. Therefore, please follow these steps in case you do not see it:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Select the <strong>Add View<\/strong> option<\/li>\n\n\n\n<li>Select the <strong>More Features<\/strong> option<\/li>\n\n\n\n<li>Find the <strong>Reports<\/strong> option and toggle it on<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"703\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-1024x703.png\" alt=\"\" class=\"wp-image-1985\" srcset=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-1024x703.png 1024w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-300x206.png 300w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-768x527.png 768w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-1536x1054.png 1536w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-2048x1405.png 2048w, https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/Template-main-50-1100x755.png 1100w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>These reports can be used to analyze the performance of your team. They are also easily shareable and exportable. There is a wide selection of reports, but using all of them isn&#8217;t necessary. Here is a brief overview of several reports that we find to be the most useful:<\/p>\n\n\n\n<ul class=\"wp-block-list large-list\">\n<li><strong>Burndown chart:<\/strong> Tracks the remaining story points in Jira and predicts the likelihood of completing the Sprint goal.<\/li>\n\n\n\n<li><strong>Burnup chart:<\/strong> Tracks project progress over time and compares the work that is planned to the work that has been completed to date.<\/li>\n\n\n\n<li><strong>Sprint report:<\/strong> Analyzes the work done during a Sprint. It is used to point out either overcommitment or scope creep in a Jira project.<\/li>\n\n\n\n<li><strong>Velocity chart:<\/strong> This is a kind of bird\u2019s eye view report that shows historical data of work completed from Sprint to Sprint. This chart is a nice tool for predicting how much work your team can reliably deliver based on previously burned Jira story points.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p>There are many new, slick work management tools on the market. Most are probably better than Jira in terms of UI and UX. That being said, as one of the oldest solutions out there &#8211; Jira has had the time and resources to develop a wide selection of features.&nbsp;<\/p>\n\n\n\n<p>This is why many PMs feel lost and confused when they are experiencing Jira for the first time. Don\u2019t worry though &#8211; we\u2019ve all been there. That\u2019s why this little guide exists, showing you the different options of tools that will work best for you. Consider this to be your starting point into the endless sea of Jira features.&nbsp;<\/p>\n\n\n\n<section class=\"banner-block\">\n  <div class=\"banner-block__info\">\n    <h5 class=\"banner-block__title\">Add checklists to your Jira tasks<\/h5>\n        <a href=\"https:\/\/marketplace.atlassian.com\/apps\/1216451\/smart-checklist-for-jira-pro?hosting=cloud&#038;tab=overview\" target=\"_blank\" class=\"banner-block__link btn btn-orange\" >Try it free<\/a>\n  <\/div>\n  <div class=\"banner-block__image\">\n    <img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2020\/05\/Smart-Checklist_Jira-3.svg\" alt=\"\" width=\"420\" height=\"331\">\n  <\/div>\n<\/section>\n\n\n\n<section class=\"writer\">\n  <div class=\"writer__image\">\n    <img alt='Oleksandr Siryi' src='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-180x180.png' srcset='https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-361x360.png 2x' class='avatar avatar-180 photo' height='180' width='180' \/>  <\/div>\n\n  <div class=\"writer-data\">\n    <span class=\"writer-data__label\">Article by<\/span>\n    <span class=\"writer-data__name\">\n      Oleksandr Siryi    <\/span>\n    <div class=\"writer-data__bio\">\n          <\/div>\n\n      <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Marty Cagan describes the job of the Product Manager as \u201cto discover a product that is valuable, usable, and feasible\u201d. Finding the balance between the business, users, and technology demands a diverse skill set. There are many things that are going on simultaneously that require attention.&nbsp;&nbsp; In this regard, Jira is great. Sure, it has [&hellip;]<\/p>\n","protected":false},"author":181780125,"featured_media":6691,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[1401,1405,1418,1409],"tags":[],"coauthors":[1427],"class_list":["post-1305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article","category-atlassian-jira","category-product-management","category-smart-checklist"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Jira For Product Managers | TitanApps Blog<\/title>\n<meta name=\"description\" content=\"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/titanapps.io\/blog\/jira-product-managers\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jira For Product Managers | Smart Checklist Blog\" \/>\n<meta property=\"og:description\" content=\"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/titanapps.io\/blog\/jira-product-managers\" \/>\n<meta property=\"og:site_name\" content=\"Titanapps\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-20T09:33:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-15T08:35:00+00:00\" \/>\n<meta name=\"author\" content=\"Oleksandr Siryi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Oleksandr Siryi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers\",\"url\":\"https:\/\/titanapps.io\/blog\/jira-product-managers\",\"name\":\"Jira For Product Managers | TitanApps Blog\",\"isPartOf\":{\"@id\":\"https:\/\/titanapps.io\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage\"},\"image\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage\"},\"thumbnailUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg\",\"datePublished\":\"2024-02-20T09:33:57+00:00\",\"dateModified\":\"2025-08-15T08:35:00+00:00\",\"author\":{\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf\"},\"description\":\"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.\",\"breadcrumb\":{\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/titanapps.io\/blog\/jira-product-managers\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage\",\"url\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg\",\"contentUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg\",\"width\":480,\"height\":319},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/titanapps.io\/blog\/jira-product-managers#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/titanapps.io\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jira For Product Managers: Useful Features Explained\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/titanapps.io\/blog\/#website\",\"url\":\"https:\/\/titanapps.io\/blog\/\",\"name\":\"Titanapps\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/titanapps.io\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf\",\"name\":\"Oleksandr Siryi\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/titanapps.io\/blog\/#\/schema\/person\/image\/3071edc8a225b0198b189bd93cd7db6f\",\"url\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png\",\"contentUrl\":\"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png\",\"caption\":\"Oleksandr Siryi\"},\"sameAs\":[\"http:\/\/blogjirachecklist.wordpress.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jira For Product Managers | TitanApps Blog","description":"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/titanapps.io\/blog\/jira-product-managers","og_locale":"en_US","og_type":"article","og_title":"Jira For Product Managers | Smart Checklist Blog","og_description":"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.","og_url":"https:\/\/titanapps.io\/blog\/jira-product-managers","og_site_name":"Titanapps","article_published_time":"2024-02-20T09:33:57+00:00","article_modified_time":"2025-08-15T08:35:00+00:00","author":"Oleksandr Siryi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Oleksandr Siryi","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/titanapps.io\/blog\/jira-product-managers","url":"https:\/\/titanapps.io\/blog\/jira-product-managers","name":"Jira For Product Managers | TitanApps Blog","isPartOf":{"@id":"https:\/\/titanapps.io\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage"},"image":{"@id":"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage"},"thumbnailUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg","datePublished":"2024-02-20T09:33:57+00:00","dateModified":"2025-08-15T08:35:00+00:00","author":{"@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf"},"description":"Product Managers need to focus on three key aspects in their job: product strategy, prioritization, and performance. This guide shows how Jira software can help with all three.","breadcrumb":{"@id":"https:\/\/titanapps.io\/blog\/jira-product-managers#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/titanapps.io\/blog\/jira-product-managers"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/titanapps.io\/blog\/jira-product-managers#primaryimage","url":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg","contentUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2024\/02\/23-1.svg","width":480,"height":319},{"@type":"BreadcrumbList","@id":"https:\/\/titanapps.io\/blog\/jira-product-managers#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/titanapps.io\/blog\/"},{"@type":"ListItem","position":2,"name":"Jira For Product Managers: Useful Features Explained"}]},{"@type":"WebSite","@id":"https:\/\/titanapps.io\/blog\/#website","url":"https:\/\/titanapps.io\/blog\/","name":"Titanapps","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/titanapps.io\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/e31194dd28ed4ff3f447c7ce300f46cf","name":"Oleksandr Siryi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/titanapps.io\/blog\/#\/schema\/person\/image\/3071edc8a225b0198b189bd93cd7db6f","url":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png","contentUrl":"https:\/\/titanapps.io\/blog\/wp-content\/uploads\/2025\/05\/oleksandr-siryi_avatar-96x96.png","caption":"Oleksandr Siryi"},"sameAs":["http:\/\/blogjirachecklist.wordpress.com"]}]}},"article_bg":"#D9DEEF","_links":{"self":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/1305"}],"collection":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/users\/181780125"}],"replies":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/comments?post=1305"}],"version-history":[{"count":24,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/1305\/revisions"}],"predecessor-version":[{"id":6692,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/posts\/1305\/revisions\/6692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/media\/6691"}],"wp:attachment":[{"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/media?parent=1305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/categories?post=1305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/tags?post=1305"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/titanapps.io\/blog\/wp-json\/wp\/v2\/coauthors?post=1305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}